A new office proposal is entering Coral Gables’ entitlement pipeline
A proposed 13-story office and retail building at 283 Catalonia Avenue is heading toward a November 20, 2026 technical review in Coral Gables. The project has attracted attention because its development team is seeking more than an ordinary site-plan signoff: the application also calls for land-use and zoning-map changes and permission to receive transferred development rights. None of those requests should be mistaken for a final approval.
The proposal is associated with Constellation Group and Boschetti Group, according to November 17 reporting by the South Florida Business Journal. Arquitectonica is identified in that coverage as the architect. The office program would include restaurant uses at street level and at the top of the building, a potentially notable addition to the downtown dining and workplace mix. These are proposed uses, not operating businesses or executed tenant leases.
The city-tracked Level 1 development-review record identifies the property as 283 Catalonia Avenue, case DLR1-26-11-0053, filed November 5, 2026. It describes a mixed-use development rather than a completed or permitted building. The distinction is important for investors evaluating the timing of new office supply.
The four separate requests behind the 13-story concept
1. A change to the future land-use map
The application seeks a small-scale comprehensive-plan amendment changing the parcel's future land-use classification from Commercial Low-Rise Intensity to Commercial High-Rise Intensity. This is a policy-level change, not simply an architectural adjustment. It asks the city to recognize a different intensity of development at this location. The final map amendment, if any, must be evaluated against the city's adopted plan and formal legislative process.
2. A zoning-map amendment
The filing also requests rezoning from Mixed Use 1 (MX1) to Mixed Use 3 (MX3). A higher-intensity mixed-use district could alter the development envelope, but the precise permitted floor area, setbacks, parking treatment and conditions cannot be established merely from the district names. The governing ordinance, adopted map and approved drawings would control.
3. Conditional-use and mixed-use site-plan review
A separate request covers conditional-use and mixed-use site-plan approval. This is where the city's evaluation of the actual building, circulation, ground-floor activity, loading, pedestrian relationships and other project-specific design and operating questions becomes critical. The applicant's conceptual program is not a building permit, and staff comments at an early technical meeting are not a construction authorization.
4. A receiving site for conservation development rights
The fourth request would designate the property as a receiver site for Conservation Transfer of Development Rights, or TDR. In general, a TDR program can direct development potential away from protected or designated sending properties toward eligible receiving sites. For this application, the crucial unresolved questions include the amount of development rights proposed, the qualifying source, any required certificates and the conditions the city would impose. The submitted Level 1 summary establishes the request, not a completed transfer.
Taken together, these requests explain why the building's 13-story headline cannot be read as a settled entitlement. The proposed tower depends on a series of related governmental decisions, and the final approved program may differ from the early concept.
What November 20 review will—and will not—decide
Coral Gables' Development Review Committee is scheduled to consider 283 Catalonia Avenue on Friday, November 20. The committee provides administrative and technical feedback on proposals before later formal actions. Its review is not a final City Commission vote, an approved zoning ordinance or a notice to proceed with construction. Written public comments may be submitted through the city's stated channels ahead of the meeting.
A second proposal, at 1008 East Ponce de Leon Boulevard, is on the same review calendar. That project is described as a 12-story mixed-use building with 67 homes and retail, whereas 283 Catalonia is being marketed primarily as office and retail. They are separate applications and should not be combined into a single development or housing count.
The distinction between application filing, staff review, planning recommendation, legislative approval and building permit is particularly consequential in Coral Gables, where changes to the comprehensive plan and zoning map require more process than a routine interior renovation. A future vote could approve, condition, modify or reject one or more requested changes.
Why the proposal matters for the downtown office market
The proposed building would add a contemporary workplace product near the city's established commercial core, with a restaurant component intended to animate both the ground floor and the upper level. A top-floor dining use may offer a differentiated amenity for office tenants, but the public sources reviewed do not establish the identity of a restaurant operator, the final seating capacity or the opening date.
For landlords and prospective tenants, a proposal is not yet competing delivered inventory. Its impact depends on whether the developer obtains the necessary entitlements, secures financing, completes design and permitting, and eventually brings leasable space to market. No verified project-specific construction loan, signed office prelease, total development cost or delivery date was found in the sources reviewed for this report.
For nearby property owners, the key questions are less about an unconfirmed completion year and more about the approved building envelope, access, traffic and pedestrian conditions. The requested change from MX1 to MX3 and the proposed TDR receiver status are likely to be more durable indicators of potential neighborhood change than a preliminary rendering.
The local context: Catalonia Avenue and the city’s development identity
Catalonia Avenue sits within the broader downtown Coral Gables environment, where offices, restaurants and civic landmarks coexist with the city's long-established Mediterranean Revival identity. Miracle Mile provides a familiar retail and dining reference point, but a photograph of Miracle Mile is not evidence of what will be built at 283 Catalonia.
The city's design expectations, street relationships and land-use rules matter because the proposed office building is not a standalone suburban business park. It would be part of a walkable commercial district whose experience depends on the quality of the ground floor, connections to surrounding blocks, loading arrangements and the treatment of adjacent public space.
For broader county context, Tryphe's Miami-Dade guide tracks the region's residential geography and development landscape. A separate Tryphe report on 930 Alton Road in Miami Beach illustrates why proposed height, office area and mixed-use classifications must be checked against primary records rather than inferred from marketing shorthand.
What remains unverified as of November 17
The available city-tracked application summary and current reporting support the 13-story proposal, the office and retail program, the November 5 filing and the November 20 review date. They do not establish a final approved floor-area schedule, signed TDR transfer, completed traffic analysis, approved parking count, construction start, sales or leasing commitments, or a financing closing.
The full signed application drawings and final municipal staff report were not independently retrieved in this review. Consequently, this report does not invent the building's gross square footage, precise height in feet, office leasing rates, restaurant square footage or expected delivery year. Those figures should be added only after primary documents or an attributable developer statement supports them.
The next documents to watch
The first milestone is the November 20 Development Review Committee discussion and any resulting comments or revisions. After that, investors should follow the land-use and zoning amendment calendars, any TDR receiver-site conditions, the formal site-plan decision and eventual permit filings. Only those later records can establish whether the proposal moves from concept to authorized development.
For now, the most accurate description is straightforward: Constellation Group and Boschetti Group have proposed a 13-story office-and-retail project at 283 Catalonia Avenue, but the city has not yet granted the collection of approvals requested in its November filing.
Primary records and further reading
City-tracked Level 1 case DLR1-26-11-0053: https://areamatter.com/fl/coral-gables/development-review-level-1-283-catalonia-ave-coral-gables-fl-33134-0000-4084b34bce
November 20 Development Review Committee meeting summary: https://poliscope.vote/meetings/69ea11e562a360b832387db2fe445d26
Local November 8 reporting on both proposed towers: https://coralgablestoday.com/coral-gables-towers-1008-east-ponce-283-catalonia/
South Florida Business Journal, November 17 development report: https://www.bizjournals.com/southflorida/news/2026/11/17/new-office-building-proposed-in-coral-gables.html
Tryphe Miami-Dade overview: https://tryphe.us/miami-dade
Related Tryphe entitlement analysis: https://tryphe.us/news/930-alton-road-arquitectonica-miami-beach-office-design-flood-resilience-2026